工程及装备

CVD Reactor (54 Rods or 84 Rods) and Heat Exchanger

SDR – 54R Specification

  • Annual Productivity : 400MT
  • Si Productivity : Min. 55kg/hr
  • Electric Power Consumption : Max. 50kWh/kg
  • Batch Cycle Time : Approx. 90hr
    • Batch Running Time
    • Batch Down Time
  • Power Supply Unit
    • Main Power Supply Unit
    • Pre-Start Power Supply System
    • Pre-Heater Power Supply Unit

SDR – 84R Specification

  • Annual Productivity : 600MT
  • Si Productivity : Min. 95kg/hr
  • Electric Power Consumption : Max. 45kWh/kg
  • Batch Cycle Time : Approx. 94hr
    • Batch Running Time
    • Batch Down Time
  • Power Supply Unit
    • Main Power Supply Unit
    • Pre-Start Power Supply System
    • Pre-Heater Power Supply Unit

Hydrochlorination Reactor with
Pre-Heater

  • SST offers the industry’s largest capacity FBR for making TCS
  • SST is offering its new generation TCS FBR (trichloro-silane fluidized-bed reactor)
  • Supports 10,000MTA of silicon per vessel
  • Capex/kg reduced >50% since old generation was introduced