CVD Reactor (54 Rods or 84 Rods) and Heat Exchanger
SDR – 54R Specification
- Annual Productivity : 400MT
- Si Productivity : Min. 55kg/hr
- Electric Power Consumption : Max. 50kWh/kg
- Batch Cycle Time : Approx. 90hr
- Batch Running Time
- Batch Down Time
- Power Supply Unit
- Main Power Supply Unit
- Pre-Start Power Supply System
- Pre-Heater Power Supply Unit
SDR – 84R Specification
- Annual Productivity : 600MT
- Si Productivity : Min. 95kg/hr
- Electric Power Consumption : Max. 45kWh/kg
- Batch Cycle Time : Approx. 94hr
- Batch Running Time
- Batch Down Time
- Power Supply Unit
- Main Power Supply Unit
- Pre-Start Power Supply System
- Pre-Heater Power Supply Unit
Hydrochlorination Reactor with
Pre-Heater
- SST offers the industry’s largest capacity FBR for making TCS
- SST is offering its new generation TCS FBR (trichloro-silane fluidized-bed reactor)
- Supports 10,000MTA of silicon per vessel
- Capex/kg reduced >50% since old generation was introduced